Photograph showing the Faraday flume for generating Station G. Below the flume structure, the Clackamas River can be seen, with several small waterfalls flowing off the hillside above.
Photograph showing the Faraday flume for generating Station G. Below the flume structure, the Clackamas River can be seen, with several small waterfalls flowing off the hillside above.
Photograph looking upstream, below proposed upper dam site at Cazadero Dam/Station G. A railroad track and flume can be seen running into the distance around a hillside, and two possible construction vehicles are visible. The river can be seen on the left side of the frame.
Photograph of the Cazadero flume at generating Station G, showing a compressed air concrete mixer on a train car. Two men stand at either side of the mixer while looking at the camera.
Photograph of the Cazadero flume at generating Station G, showing air compressor and pipelines weld, in placing concrete for new bents. Several cars can be seen on a railroad track, and the flume can be seen running along the right side of the frame.
Photograph showing the Cazadero Dam flume running into the distance. Trees (possible burned) can be seen on both sides of the (excavated?) canal.
Cazadero Dam, flume and railway
Photograph looking towards flume and railway tracks at Cazadero Dam/ Station G. A man stands on the railway tracks in the distance, and a dirt hillside drops down between the tracks and the flume.
Photograph taken from a side angle, showing the flume at the Cazadero Dam/Station G. Below the wooden flume is a dirt hillside with rocks, and a long wooden building can be seen in the background on the right side of the frame.
Photograph taken from above Cazadero Dam/Station G, looking downriver towards the spillway and wooden dam structure. Behind, a dirt hillside and trees can be seen.
Photograph showing construction of Cazadero Dam. Several workers can be seen in the distance at the top of a stacked wooden dam structure, with a dirt hillside above. The Clackamas River is visible at the bottom of the dam, and trees (possibly burnt) can be seen at the top of the hill.
Cazadero Dam, re-decking complete
Photograph showing completed re-decking on the spillway at Cazadero Dam/Station G. Wood debris can be seen in the water below the spillway, and leftover ropes, ladders and tools are visible on the lower walkway.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing workers during re-decking of the Cazadero Dam. Four men stand at the top of the structure, while one sits on a ladder looking upward. Another part of the wooden dam is visible in the background.
Photograph showing the Cazadero Dam during a flood, before the placement of a new apron. Fast flowing water spills over the dam.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing on the right side. Ice formations are on the hillside to the left, and snow and frost can be seen on the wooden dam structure.
Photograph of a construction at the Cazadero Dam during construction. Wooden structure is visible with water from the Clackamas River flowing through the bottom, towards the camera.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing through the bottom of the dam, and trees are visible on the hillside in the distance.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing through the bottom of the dam, and trees are visible on the hillside in the distance. (Image note: similar to PGE7-6, but appears to show further stage of completion).
Station G, Cazadero power station
Photograph showing the exterior of the Cazadero power station taken from across the Clackamas River. Four large pipes run uphill from the building. Previously burnt trees can be seen in the background.
Cazadero Dam, transformer house
Photograph of a man standing in the Cazadero Dam/Station G transformer house. The man wears a hat and a work apron. The inside of the walls are wooden, with a brick wall visible in the background.
Cazadero Dam, powerhouse construction
Photograph, taken from across the river, of the Cazadero powerhouse/Station G. Part of the roof is incomplete, and three pipes run from the building up the hill. A stairway next to the pipes goes from the building to the top of the hill.
Cazadero Dam, powerhouse foundation
Photograph showing construction progress of the powerhouse at Cazadero Dam/Station G, taken from a high angle looking downhill. The foundation can be seen on the near side of the river, with multiple men working. Across the river, a dirt hillside with fallen trees and stumps can be seen.
Photograph taken from a high angle of penstock units at Cazadero Dam/Station G. The pipes can be seen running downhill towards the in-progress powerhouse, with numerous workers.
Photograph showing construction progress on the intake penstocks at the Cazadero Dam/Station G. Workers are visible in the center of the frame, and five large pipes are seen on the right. Construction debris can be seen throughout the image.
Oak Grove project, water filling pond less than one hour after closing dam
Photograph showing a cement dam on the Oak Grove Fork of the Clackamas River, with a noticeable water pool in front of the dam structure. A man seated on a platform can be seen over the water on the right side of the image, with submerged pieces of wood to the left. Negative sleeve notes “less than one hour after filling.” (Image note: see related image PGE 16-903).
Oak Grove project, closing of gates at dam
Photograph showing a cement dam on the Oak Grove Fork of the Clackamas river, captured immediately after closing for the first time. Water can be seen at the base of the dam to the front, with four men visible to the right. Uphill from the dam structure, other wooden structures can be seen. (Image note: see related image PGE 16-927).
Oak Grove project, group standing on pipe at lower portal of tunnel #2
Photograph showing a group of men standing on large pipes. The men at the right of the frame look towards the camera, and are wearing hats with suit vests or dress shirts. They are Clark, Franklin T. Griffith, Fuller, Caldwell, and Osborne. Four men can be seen on the left side of the frame with tools, leaning towards the pipe work. A tunnel entrance can be seen in the background.
Oak Grove project, view of dam
Photograph showing the concrete dam structure at Oak Grove during construction. Around the dam are several wooden structures, including a possible flume. On the left side, a wooden ladder leans again the dam.