Portland General Electric Company Clackamas River (Or.) cellulose nitrate film
Print preview View:

42 results with digital objects Show results with digital objects

Oak Grove Project construction

Photograph from Oak Grove project showing construction of unit plant and penstock. A brick building can be seen at the base of a dirt hill, with a small round building visible at the top. The Clackamas River runs along side the building and supporting wall.

Cazadero Dam

Photograph looking upstream, below proposed upper dam site at Cazadero Dam/Station G. A railroad track and flume can be seen running into the distance around a hillside, and two possible construction vehicles are visible. The river can be seen on the left side of the frame.

Oak Grove project, powerhouse

Photograph showing the Oak Grove powerhouse during construction. The Oak Grove Fork of the Clackamas River can be seen running alongside the building area, while a large pipe and possible flume extend uphill from the structure. A wooden trestle is also visible on the hillside above the building.

Oak grove project, powerhouse

Photograph taken from a high angle and looking downwards at construction of the Oak Grove powerhouse, with the Clackamas River visible at the left of the frame. Metal and wood framework can be seen throughout the image, with numerous workers and lumber piles also visible. A railroad track and dirt road cut through the hillside and extend into the distance.

Oak Grove project, looking upstream from powerhouse

Photograph looking upstream and downward at the Oak Grove powerhouse during construction. Wood and metal framework, and men working, can be seen throughout the site, with piles of dirt and lumber in the background. On the left side of the image is a metal bucket attached to a hook and pulley. In the background is the Oak Grove Fork of the Clackamas River.

Oak Grove project, Clockhouse at Big Bottom

Photograph showing a man standing next to a wooden “clockhouse” building with snow. He is wearing winter clothing, a hat, and is holding a rifle. Downhill from the building is the Clackamas river. Written on the negative is “Clockhouse at Big Bottom 12/15/20.” (Image note: see related image PGE 16-37.”

Oak Grove project lower dam site at intake

Photograph showing three men on a steep hillside above the Clackamas River(?). One man sits towards the front of the group, while the other two behind are standing and looking towards the camera. At the base of the cliff is flowing water and logs. Written on the negative is “Lower Damsite at Intake, 5-4-20.”

Cazadero Dam

Photograph of the Cazadero Dam taken in front of the spillway. Water flows over the ledge into a pool at the base, and another stream of water can be seen spilling down on the right side of the frame. The stacked wooden dam structure is visible to the left of the main spillway.

River Mill, suspension bridge

Photograph showing a suspension bridge over the Clackamas River in near the River Mill dam area. The bridge crosses between two tall cliff faces, beyond which the river can be seen around. Snow is on the ground throughout the image. Written on the negative is “Feb 3, ‘10, PES 2014.”

Results 1 to 28 of 42