Photograph showing the exterior of the Cazadero power station taken from across the Clackamas River. Four large pipes run uphill from the building. Previously burnt trees can be seen in the background.
Photograph showing the construction of the spillway at the River Mill Dam. At the left side of the frame, a portion of a wooden suspension bridge can be seen. Behind, a railroad bridge spans the space between two cliffs, beyond which wooden buildings are visible. Written on the negative is “#84M. 1-28-11.”
Photograph showing the exterior of the River Mill Dam powerhouse, likely shortly after construction. Loose hillsides can be seen to the left and right of the building, with transmission lines throughout (image note: corner of glass negative is broken and missing).
Photograph taken from a side angle of the River Mill Dam and powerhouse, showing exterior of building and view of dam structure. Water from the Clackamas River can be seen moving over the dam, and trees and transmission lines are visible in the distance.
Photograph of the River Mill Dam, showing recently cut trees and possibly dam structure under construction. Water can be seen at the front of the frame.
Photograph of River Mill Dam looking upstream. The powerhouse can be seen to the right of the large dam structure, with a smaller wooden building to the front. In the background, a distant railroad bridge can be seen.
Photograph taken from a bridge and looking downriver at the River Mill Dam and powerhouse. The Dam structure can be seen on the left, with the powerhouse building on the right.
Photograph showing the left bank of the Clackamas River at the river Mill Dam, taken from the “island.” Near the center of the frame, two men in long jackets stand next to a surveying station. To the left, another man in a hat and jacket looks at the camera. In the distance, men can be seen working on the dam spillway. Written on the negative is “#70M. 11-28-10.”
Photograph showing the Clackamas River in the River Mill area, with numerous “islands” and cliffs. A wooden suspension bridge can be seen spanning two cliffs near the center of the frame, with numerous wooden buildings visible in the distance. Written on the negative is “#58M. 8-12-10.”
Photograph showing the Clackamas River in the river Mill area, with numerous “islands” and cliffs. In the distance, a railroad track crossing a bridge is visible. Cut trees can be seen at the right side of the frame. Written on the negative is “#M56. 8-1910.”
Photograph looking downstream looking towards the “island,” with a wooden suspension bridge visible. In front of the bridge a blurry man can be seen facing the camera. Beyond the bridge is a small wooden building next to several vertical poles. Written on the negative is “#60M. 10-10.”
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
Photograph showing completed re-decking on the spillway at Cazadero Dam/Station G. Wood debris can be seen in the water below the spillway, and leftover ropes, ladders and tools are visible on the lower walkway.
Photograph showing in-progress re-decking of the spillway at the Cazadero Dam/Station G. Men are visible at the top and bottom of the structure, and water and wood debris can be seen below the spillway.
A photograph of the Clackamas River. Rocks are visible in the water and tall trees line the shore. The negative envelope reads, "Clackamas river? - Estacada."
Photograph looking downriver, showing a bridge above the dam and lodge (building visible on left at top of hill). Another wooden building is visible next to the lodge, and the river continues around a bend into the distance.
Photograph showing construction of Cazadero Dam. Several workers can be seen in the distance at the top of a stacked wooden dam structure, with a dirt hillside above. The Clackamas River is visible at the bottom of the dam, and trees (possibly burnt) can be seen at the top of the hill.
Photograph taken from a high angle of penstock units at Cazadero Dam/Station G. The pipes can be seen running downhill towards the in-progress powerhouse, with numerous workers.
Photograph showing construction progress of the powerhouse at Cazadero Dam/Station G, taken from a high angle looking downhill. The foundation can be seen on the near side of the river, with multiple men working. Across the river, a dirt hillside with fallen trees and stumps can be seen.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing through the bottom of the dam, and trees are visible on the hillside in the distance. (Image note: similar to PGE7-6, but appears to show further stage of completion).
Photograph, taken from across the river, of the Cazadero powerhouse/Station G. Part of the roof is incomplete, and three pipes run from the building up the hill. A stairway next to the pipes goes from the building to the top of the hill.
Photograph showing construction progress on the intake penstocks at the Cazadero Dam/Station G. Workers are visible in the center of the frame, and five large pipes are seen on the right. Construction debris can be seen throughout the image.
Photograph showing construction at Cazadero Dam. The Clackamas River can be seen flowing through the bottom of the dam, and trees are visible on the hillside in the distance.